Building Faster. Building Smarter.

Arizona's #1 Strata-trained builder. Prefab technology meets boutique craftsmanship.

The LÏEF Integrated Model

Most developers design, then hand off to GCs. Most GCs coordinate subs. Every handoff is a delay, a cost overrun, a quality risk. LÏEF controls the full stack—from architectural vision to final walkthrough.

1

Creation

Design, Branding

2

Technology

SABS Manufacturing, ICF

3

Construction

GC Oversight, 250+ Subs

4

Delivery

Seamless Handoff

Strata SABS Partnership

What is SABS?

  • • Strata Advanced Building System
  • • Precision-manufactured foam wall panels
  • • Replaces traditional wood framing
  • • Assembled on-site in days, not weeks

The Numbers

20-30%

Faster construction timelines

15-25%

Lower labor costs

50-70%

Reduction in heating/cooling costs

How It Works

01

Design

We design SABS walls to exact project specs

02

Manufacture

Panels made off-site by Strata

03

Delivery

Panels shipped to job site

04

Assembly

Our crews + Strata support assemble in days

440 Basin Case Study

Project

440 Basin, Pahrump, NV

Size

204 units

Technology

Strata SABS throughout

Results

$56M

Savings vs traditional construction

$80/SF

Cost reduction

Accelerated

Timeline

ICF Construction

What is ICF?

  • • Insulated Concrete Forms
  • • Superior energy efficiency (50-70% lower energy costs)
  • • Extreme durability in desert climate

Why ICF in Phoenix?

  • • 110°F+ for 60+ days per year
  • • Desert heat demands premium building envelope
  • • Lower long-term energy costs = higher property values

Ready to build with SABS? Let's partner.